June 17, 2014 video filmed by the Lower Colorado River Authority.
June 4, 2015 video filmed by the Alliance for P.E. Pipe.
December 12, 2016 video filmed by Dave Stewart of an in-house premanufactured 4" PRV HDPE replacement assembly. The time it took to install the replacement PRV assembly in the field was only 1 hour and 42 minutes from the shutdown of the watermain to full restoration of water service to the affected downstream portion of the water distribution system.
May 15, 2019 video filmed by the Texas Commission for Environmental Quality (TCEQ) first presented at the TCEQ 2019 Texas Environmental Excellence Award ceremony.
October 12, 2020 video filmed by Dave Stewart of an excavator and a forklift removing a 52' long 63" SDR 17 HDPE pup weighing nearly 16,000 lbs. from a McElroy MegaMac 1600 fusion machine.(Hamilton Wetlands Restoration Project, Bell Marin Keys, California / Bryan Hauger Consulting Associates, Inc.)
October 19, 2020 video filmed by Dave Stewart of 3 excavators removing a 102' long 63" SDR 17 HDPE stringer weighing nearly 31,000 lbs. from a McElroy MegaMac 1600 fusion machine. (Hamilton Wetlands Restoration Project, Bell Marin Keys, California / Bryan Hauger Consulting Associates, Inc.)
Stewart HDPE Consulting LLC
Copyright © 2019 Stewart HDPE Consulting, LLC - All Rights Reserved.
Powered by GoDaddy Website Builder
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.